Specifications
| Structure | Phase 1F-D |
| (2 storey shop office) | |
| Structure | Reinforce concrete frame |
| Wall | Reinforce concrete structure |
| Roof | Concrete roof tiles |
| Ceiling | Asbestos free cement sheet ceiling (first floor) |
| Windows | Aluminium frame casement and top hung window |
| Doors | Main door : Aliminium roller shutter |
| Side entrance : Decorative door | |
| Rear door : Plywood flush door | |
| Toilet : PVC door | |
| Floor finishes | |
| Ground floor | Shop & verandah : cement rendered |
| Toilet : ceramic tiles | |
| First Floor | Office : cement rendered |
| Toilet : ceramic tiles | |
| Paint | Quality paint |
| Sanitary fittings | |
| Ground floor | Sitting W.C : 2 nos |
| Hand basin : 2 nos | |
| Aluminium sink : 1 nos | |
| First floor | Sitting W.C : 2 nos |
| Hand basin : 2 nos | |
| Aluminium sink : 1 nos | |
| Electrical wiring /fittings | |
| Ground floor | Light point : 9 nos |
| 13 amp. Power point : 5 nos | |
| Air-cond point : 2 nos | |
| Fan point : 2 nos | |
| Telephone point : 1 no | |
| First Floor | Light point : 9 nos |
| 13 amp. Power point : 5 nos | |
| Air-cond point : 2 nos | |
| Fan point : 2 nos | |
| Telephone point : 1 no |